Buyer guide · Inspection

QC Checklist

The checkpoints worth defining before inspection so quality evidence can be compared with an approved project standard.

MARFA quality inspectors checking a finished custom cabinet
Inspection records should connect each acceptance point to visible, traceable evidence.
A commercial casework inspection should verify the approved documents first, then materials, dimensions, construction, function, finish, identification and packing. Evidence should show what was checked, not only that an inspection occurred.

Start with the approved reference

Inspecting against an obsolete drawing can create a complete report for the wrong product.

  • Current drawings, BOQ and finish sample.
  • Approved first article or control sample.
  • Inspection level, tolerances and release authority.

Check construction and dimensions

Focus measurement on interfaces that affect installation and function rather than collecting random dimensions.

  • Critical overall and interface dimensions.
  • Panel thickness, joints, reinforcement and fixing provisions.
  • Level, square, alignment and repeated module consistency.

Check function and appearance

Photographs should include context, scale and the product or room code.

  • Doors, drawers, locks, lighting and removable panels.
  • Colour, sheen, grain direction, edge quality and visible defects.
  • Hardware identity, quantity and adjustment.

Check identification and packing

Shipment release should clearly identify open defects, rework evidence and the person authorising dispatch.

  • Product, room, zone and package labels.
  • Surface, edge, corner and hardware protection.
  • Carton condition, handling marks and packing list reconciliation.

Use this guide in the project file

Attach the relevant checklist to the current drawing, quotation or approval record. Record project-specific decisions in writing and confirm destination requirements with the responsible professional or authority. We record project-specific decisions clearly and confirm destination requirements before production.

Inspection evidence record

Set the evidence requirement before inspection so a late photo set cannot replace a planned control point.

Record areaWhat to retain
Check pointApproved reference, dimensional tolerance, and functional requirement.
EvidencePhotographs, measurement record, sample comparison, or packing check.
DispositionAccepted, corrected, open item, or shipment-release decision.