Project-ready casework · Drawings, finishes, QC and export packing coordinated as oneFor hospitality, retail and commercial interiors

Buyer guide · Verification

Verify Before Production

Keep company, product, quality and export evidence visible before a commercial furniture package is released.

Furniture production facility prepared for buyer review
Good verification is specific to the product, project and evidence needed for the next decision.
Before production, international buyers should verify the contracting entity, payment beneficiary, approved technical set, material and finish references, inspection plan, packing responsibilities and destination documents.

Verify the commercial entity

Any mismatch should be clarified through an independently verified company channel before payment.

  • Legal company name and registered information.
  • Quotation, contract, invoice and beneficiary consistency.
  • Authorised contact and communication record.

Verify the production reference

A production deposit should not rely only on reference images or an uncontrolled message thread.

  • Approved drawing revision and BOQ.
  • Signed material, finish and hardware references.
  • Sample or first-article approval record.

Verify quality and shipment control

The buyer should know who can release the shipment and how unresolved defects will be recorded.

  • Inspection scope, timing and evidence.
  • Defect correction and shipment-release authority.
  • Packing list, labels and destination documentation.

Maintain an auditable file

This guide is a procurement checklist, not legal or financial advice; destination-specific verification may require professional review.

  • Store approvals, revisions and commercial documents together.
  • Record changes and accepted deviations.
  • Retain inspection and shipping evidence after delivery.

Use this guide in the project file

Attach the relevant checklist to the current drawing, quotation or approval record. Record project-specific decisions in writing and confirm destination requirements with the responsible professional or authority. We record project-specific decisions clearly and confirm destination requirements before production.

Supplier verification record

Keep supplier verification as a dated project file rather than an informal message thread.

Record areaWhat to retain
Business identityLegal entity, named project contact, and verified communication channel.
Technical capabilityRelevant drawings, samples, quality process, and documentation route.
Commercial controlQuotation assumptions, approval process, inspection release, and export handoff.

Bring the evidence into the first review.

Request a Project Quote
WhatsApp